Saturday, October 18, 2014

Good Day/Bad Day

Call this one a draw, or a slight loss...
First, shopping at Michaels craft store for their Halloween clearance. Yeah. Clearance. Not even Halloween yet, and they're already selling it all off and putting up Christmas...

The upside is we can get great discounts on decorations and still have time to incorporate them into our display!

Today we picked up a bunch of Spookytown buildings and accessories to add into our display. Check out the video below!

This afternoon was supposed to see the crypt interior walls go up, with the crypt being completed tomorrow. Instead, one wall ended up in four pieces, and my shoulder ended up completely non-functional. I'll need a full day just to rebuild the wall, before I can even think about doing the crypt...majorly disappointing!

Oh well- check out Spookytown:

Saturday, October 4, 2014

Finishing Touches

Another beautiful day, which we made full use of. Put up the partial wall on the crypt, the rear barrier to keep folks out of the garage, and glued the 3rd crypt wall together. Added some finishing touches to the crypt facing and the roof, plus little bits here and there.

The pics below show the crypt during the day and at night. You can see the addition of two gargoyles on the roof, door knockers on the front walls, and a bat hanging inside the crypt.


The gargoyles and false wall show up better in this shot. We added the wall on the front corner, as the existing structure wasn't convincing- this at least looks like it's a corner:

Close-up of the false wall. It adds some depth and carries off the broken-wall look we're after:


The view from the street:

The front of the house, day and night. We still have more lighting to add:



Friday, October 3, 2014

Crypt Exterior

A full afternoon in 76 degree weather- rare for this time of year- allowed us to get the crypt exterior put up. Tomorrow we'll finish decorating the yard- adding the rest of the lights, hanging the ghouls, and other little touches- then start working on the crypt interior.

Already, we've seen an increase in foot and vehicle traffic as people come by to check out the place. It's really the best feeling when the work is up and you can sit back and watch people enjoy the efforts...
The graveyard at Nevermore Manor

The crypt entrance

The white streak is the moon over the graveyard

Nevermore Manor wouldn't be complete without a Raven

Wednesday, October 1, 2014

October 1st!

It's been a long, strange trip...

Here we are, October 1st- time to start setting up. Got the tombstones and fencing put up, along with the floodlights. We'll add more tomorrow and Friday, and try to finish it by Saturday.

Still have the crypt interior to finish, but that can't be done until the crypt exterior is out of the garage- plus, it won't be viewed for some time yet.

Here's some pics of the first day's setup:
The cemetery is up, just need to add the finishing touches

View through the fence

The Blackberry doesn't do it justice- the blue lights give a nice glow

Monday, September 1, 2014

Crypt Completion

Well, Labor Day lived up to its name- another full day of work, but the crypt is more or less finished. Once again, Math bested me in single combat and I ended up 2 feet short on my burial niches, but I can fix that later. I need to add some boards to give the foam more support, and I need to add a roof and some trim around the garage door opening, but that's it. Come October 1st, when we put it up, we'll do some additional detailing and weathering, add some moss, and then put the skeletons and candles everywhere.

This was a challenging build, and it seemed like nothing was going to go right, it would never be finished, etc. But now that it's "done", the hard work really seems to have paid off. I'm pleased with how it turned out, and can't wait to get the lights sorted out and test it.


 






Friday, August 29, 2014

Home Stretch

Got the walls up.
A trip to the hardware store, an afternoon of measuring and cutting and drilling, and now the entrance is assembled.

Remaining tasks:
  • Paint the exterior boards
  • Trim and tape the SceneSetters on the inside
  • Make a bottom section for the front facade
  • Make a wall section for the front facade
  • Cover the roof supports with weed block
Total work time: about 2 days. Then we're done with the exterior build and can start on the interior. I'm hoping to have it complete by mid-September and then I can concentrate on the remaining odds and ends for the haunt.





Saturday, August 23, 2014

Inside Out

Taking advantage of the warm weather and abundant sunshine, I tested the finish on the outside of the walls for water resistance. The blue color wash held up, the yellow came off a bit, and the brown came off about half the stones. So, after consultation with SpiderWitch, I went back over them with a blue and a gray wash. I also went over the panel lines to bring them out from the background.

Once that was done, it was time to glue/staple the SceneSetter backing on the inside of the walls. This was tedious, and it didn't help that a breeze blew in. But, all the walls have their insides prepped, so the project is one BIG step closer to being finished.

The next step will be to assemble the structure using L-brackets and fastening plates, to hold it steady while I make a roof out of the weed-barrier fabric. When that is complete, I'll finish detailing the outside walls- paint the trim boards, finish the bottom of the walls, add the moss and maybe some stains.

In September, I'll work on the bricks which will be laying about the grounds, as well as the crypt itself. Slow but steady...

Here are some pics of the repainted walls:

The inner side of the wall, showing the SceneSetter

The front arch, with its fresh coat of blue and gray

The upper side wall, with the toned-down brown panels